1
/
of
7
Vesgantti Twin Mattress, 10 Inch Innerspring Hybrid Single Bed Mattress in a Box with Breathable Foam and Pocket Spring, Ergonomic Design, Medium Firm Feel
Vesgantti Twin Mattress, 10 Inch Innerspring Hybrid Single Bed Mattress in a Box with Breathable Foam and Pocket Spring, Ergonomic Design, Medium Firm Feel
Regular price
$230.98 USD
Regular price
Sale price
$230.98 USD
Shipping calculated at checkout.
About This
- Medium-Firm Feel: Fully expanded 75*39*10 inch(LWH) approx. Vesgantti luxury multi-layer foam and pocket spring support system provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
- Individual Pocket Spring: Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
- Breathable and Healthy: Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
- Ultra Quite: Due to the pocket spring + multi-layer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
- 【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Smaller size, easy to carry. Please allow 48 hours for the mattress to fully expand after unpacking. Thickness measurement tip: the distance from the height of the fully expanded foam to the bottom of the base.(Please note: once the mattress open and restore, it cannot be roll back again)
Overview
- Brand : Vesgantti
- Size : Twin
- Product Dimensions : 75"L x 39"W x 10"Th
- Top Style : Tight Top
- Cover Material : Polyester or Polycottons
- Number of Layers : 4
- Fill Material : Memory Foam
- Special Feature : Orthopedic, Pressure Relief, Breathable, Low Motion Transfer, Cooling
- Color : White
- Coil Type : Pocketed Coil
- Item Firmness Description Medium Firm : Construction Type Innerspring, Foam Construction, Hybrid Construction Innerspring, Foam Construction, Hybrid Construction See more
- : Item Firmness Description Medium Firm
- : Construction Type Innerspring, Foam Construction, Hybrid Construction Innerspring, Foam Construction, Hybrid Construction See more
Quantity
Couldn't load pickup availability
Low stock: 3 left
View full details
