Skip to product information
1 of 7

Vesgantti Full Size Mattress, 10 Inch Innerspring Hybrid Full Mattress in a Box, Pressure Relief Pocket Spring Double Bed Mattress with Memory Foam & Knitted Fabric, Medium Firm, CertiPUR-US

Vesgantti Full Size Mattress, 10 Inch Innerspring Hybrid Full Mattress in a Box, Pressure Relief Pocket Spring Double Bed Mattress with Memory Foam & Knitted Fabric, Medium Firm, CertiPUR-US

Regular price $280.48 USD
Regular price Sale price $280.48 USD
Sale Sold out
Shipping calculated at checkout.

About This

  • 【Medium Firm Plush Feel】Full bed mattresses are fully expanded 75*54*10 inch(LWH) approax. Vesgantti luxury mutilayer foam and pocket spring support systerm of mattress full size bed provide medium firm yet comfortable feelwhich will protect and support your lumbar vertebra and back from pain. Boxed mattress full size fits most bedframe types except adjustable frame.
  • 【Individual Pocket Spring】Innovative zoned spring support system with ergonomic design of full bed mattress is constructed by hundreds of individual pocketed stainless spring coils. Each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture.
  • 【Breathable and Healthy】This double mattress is designed with multi-layer foams and pocket spring which increasing good air circulation and breathability. It keeps body comfortable and dry and provides a cooler sleeping environment. This double bed mattress contains no fiberglass, which means a healthier sleep environment.
  • 【Ultra Quite】Due to the pocket spring and multilayer foams design, this innerspring mattress can effectively absorb noise and vibration. So you won't be disturbed by any tossing and turning from your partner and enjoy a peaceful and comfortable sleep.This full size bed mattresses can support weight up to 250 lbs.
  • 【Full Size Mattress in a Box】Our mattress full is compressed, rolled, and shipped in a box for ultimate convenient delivery to your door. For a better sleeping experience, please wait 72 hours for the mattress to fully expand. You can contact the Vesgantti support team if you have any problems. (Cautions: Make sure no one is standing at the direction where the mattress is rolling out to prevent any unnecessary injury. Once the mattress open and restore, it cannot be rolled back again.)

Overview

  • Brand : Vesgantti
  • Size : Full
  • Product Dimensions : 75"L x 54"W x 10"Th
  • Top Style : Euro Top
  • Cover Material : Knitted Fabric
  • Number of Layers : 2
  • Fill Material : Memory Foam
  • Weight Limit : 2.5E+2 Pounds
  • Special Feature : Pressure Relief
  • Color : Grey
  • Item Weight 56.4 Pounds : Item Firmness Description Medium Firm
  • : Item Weight 56.4 Pounds
  • : Item Firmness Description Medium Firm
Quantity

30 in stock

View full details