1
/
of
7
Vesgantti Queen Mattresses, 12 Inch Innerspring Hybrid Queen Size Mattress, Pressure Relief Pocket Spring Bed Mattress in a Box with Breathable Memory Foam, Medium Firm Plush, CertiPUR-US
Vesgantti Queen Mattresses, 12 Inch Innerspring Hybrid Queen Size Mattress, Pressure Relief Pocket Spring Bed Mattress in a Box with Breathable Memory Foam, Medium Firm Plush, CertiPUR-US
Regular price
$346.48 USD
Regular price
Sale price
$346.48 USD
Shipping calculated at checkout.
About This
- 【Medium Firm Plush Feel】 Queen size mattresses are fully expanded 80*60*12 inch(LWH) approax. Vesgantti luxury mutilayer foam and pocket spring support systerm of queen size mattresses provide medium firm yet comfortable feel which will protect and support your lumbar vertebra and back from pain.
- 【Individual Pocket Spring】Innovative zoned spring support system with ergonomic design of mattress queen is constructed by hundreds of individual pocketed stainless spring coils. Each spring of queen size mattress work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture.
- 【Breathable and Healthy】This hybrid mattress queen is designed with multi-layer foams and pocket spring which increasing good air circulation and breathability. It keeps body comfortable and dry and provides a cooler sleeping environment. This queen bed mattress contains no fiberglass, which means a healthier sleep environment.
- 【Ultra Quite & Motion Isolation】Due to the pocket spring and multilayer foams design, this innerspring mattress can effectively absorb noise and vibration. So you won’t be disturbed by any tossing and turning from your partner and enjoy a peaceful and comfortable sleep.This queen hybrid mattress can support weight up to 250 lbs.
- 【Mattress in a Box】Our mattress queen size is compressed, rolled, and shipped in a box for ultimate convenient delivery to your door. For a better sleeping experience, please wait 72 hours for the mattress to fully expand. Boxed mattress fits most bedframe types except adjustable frame. (Cautions: Make sure no one is standing at the direction where the mattress is rolling out to prevent any unnecessary injury. Once the mattress open and restore, it cannot be rolled back again.)
Overview
- Brand : Vesgantti
- Size : Queen
- Product Dimensions : 80"L x 60"W x 12"Th
- Top Style : Euro Top
- Cover Material : Breathable Knit Fabrics, Solid-Quality Cotton
- Number of Layers : 5
- Fill Material : Memory Foam
- Weight Limit : 250 Pounds
- Special Feature : Breathable, Fire Retardant, Low Motion Transfer, Pressure Relief
- Color : Grey
- Item Weight 81.8 Pounds : Item Firmness Description Medium Firm
- : Item Weight 81.8 Pounds
- : Item Firmness Description Medium Firm
Quantity
Couldn't load pickup availability
30 in stock
View full details
